CareSource

CareSource

Dayton, OH Installation of architectural precast for Care Source in downtown Dayton Ohio....

read more

University of Cincinnati Health Science Bldg.

University of Cincinnati Health Science Bldg.

Cincinnati, OH Ben Hur erected 210 pieces of insulated architectural precast on the University of Cincinnati’s Health Sciences building.  The Health Sciences building is a 117,000 square foot structure that will house classrooms, labs, and offices. The building is situated such that many of the panels had to be erected in the blind with a 275T Luffing Crawler crane....

read more

Churchill Downs

Churchill Downs

Louisville, KY Ben Hur was contracted to erect 486 pieces of precast at Churchill Downs in Louisville, Kentucky.  This precast Colonnade consisted of columns, spandrels, and decorative caps all placed to aid in crowd control and bring a fresh new look to the Iconic facility.  The new Colonnade seamlessly flows to accommodate entry and exit gates, a new main ticket area, security offices, shipping gates, and screen walls to hide the main electrical transformers.   The highlight of the project is the new Main Entrance which consists of arched spandrel panels set between decorative columns and ornate topping pieces....

read more

Integrity Express Logistics Office Building

Integrity Express Logistics Office Building

Blue Ash, OH Ben Hur installed 176 architectural precast panels using a 80 ton crawler crane on a structural steel frame....

read more

Sinclair Building 14 Addition

Sinclair Building 14 Addition

Dayton, OH Ben Hur was contracted to erect 88 pieces of Architectural Precast on a steel frame building, of which 24 pieces were in and under the structure....

read more

Valvoline Headquarters

Valvoline Headquarters

Lexington, KY Ben Hur was contracted to erect 189 precast panels on the new Valvoline World Headquaters Office Bldg.  The project required the use of a 100ton Linkbelt Crawler Crane to hoist 183 panels onto the structure.  The heaviest panels weighed in excess of 20,500lbs.   We also erected 6 panels on the underside of the structure with a 12,000lb Telehandler style fork lift.  Many of the precast panels were installed at a slope giving this project a unique look.  The 4 story structure was shaped like a giant “V” for Valvoline and the precast cladding added to its overall curb appeal....

read more