top of page

Centene West Garage

The second largest precast parking garage Ben Hur has erected. Thirteen levels; 1,530 structural pieces and 400 cladding pieces. The ground level of the garage was 35 feet below grade and the adjacent street. The job required substantial temporary bracing, to the minute load scheduling due to the highly congested urban area and hoisting the erection in and out of the hole with a 650 ton assist crane.

Project Gallery

bottom of page