Aviation

University of Kentucky Student Center

University of Kentucky Student Center

Lexington, KY The University of Kentucky Student Center project consists of 360,000 square feet (247,500 square feet of new construction and 112,500 square feet of renovated construction). The new construction includes a movie theatre, bookstore, and food services for the largest University in Kentucky. The renovation consists of two buildings – one constructed in 1938 and the other is the Alumni Gymnasium which in 1924. The Alumni Gymnasium is where Adolph Rupp started his storied career with the Wildcats. Ben Hur fabricated and erected the structural steel and installed the miscellaneous steel package for this...

read more

Integrity Express Logistics Office Building

Integrity Express Logistics Office Building

Blue Ash, OH Ben Hur installed 176 architectural precast panels using a 80 ton crawler crane on a structural steel frame....

read more

Worldwide Technology – New Corporate HQ

Worldwide Technology – New Corporate HQ

Maryland Heights, MO Ben Hur Construction and Steel Worx were contracted to fabricate and install 1,700 tons of structural steel for the new 200,000 square foot WWT Corporate HQ located in Westport Plaza.  Ben Hur Construction also installed 587 pieces of precast for the new 204,000 square, four level new parking ramp located next to the new office...

read more

Sinclair Building 14 Addition

Sinclair Building 14 Addition

Dayton, OH Ben Hur was contracted to erect 88 pieces of Architectural Precast on a steel frame building, of which 24 pieces were in and under the structure....

read more

BJC East/West Connector Bridge

BJC East/West Connector Bridge

St. Louis, MO Ben Hur fabricated and erected 1,200 linear feet  of pedestrian bridges with a total weight of 380 tons.  Our team modularized the bridge sections at our Shreve Avenue facility.  We closely coordinated with our cutomer and other trade contractors to apply in our yard as many other items to the bridge as possible to save work at the project site.  The shipping and installation was particularly challenging as the bridges were located in the middle of an active medical campus which required minimizing the shut down of streets and...

read more

Valvoline Headquarters

Valvoline Headquarters

Lexington, KY Ben Hur was contracted to erect 189 precast panels on the new Valvoline World Headquaters Office Bldg.  The project required the use of a 100ton Linkbelt Crawler Crane to hoist 183 panels onto the structure.  The heaviest panels weighed in excess of 20,500lbs.   We also erected 6 panels on the underside of the structure with a 12,000lb Telehandler style fork lift.  Many of the precast panels were installed at a slope giving this project a unique look.  The 4 story structure was shaped like a giant “V” for Valvoline and the precast cladding added to its overall curb appeal....

read more

Mt. Carmel New Bed Tower

Mt. Carmel New Bed Tower

Columbus, OH This project consisted 390 pieces Architectural Precast on a cast in place frame. A tower crane and a 75 Ton RT were used to rotate the panels.  Stainless steel connections were used on the shear walls all other connections glavanized...

read more

Harrison Memorial Hospital Addition

Harrison Memorial Hospital Addition

Cynthiana, KY Ben Hur installed 112 new architrual precast panels on the expansion of Harrison Memorial Hospital.  The project was surrounded by the existing hospital on two sides, with 34 panels having to be erected between the new and existing structures.  Ben Hur also removed a panel from the existing hospital to allow the ER to continue service throughout the project.  Once the expansion was complete we reinstalled the first floor ER panel (below existing...

read more

Spartan Light Metals

Spartan Light Metals

Sparta, IL Spartan Light Metal Products is a solutions leader in the design and manufacturing of aluminum. Ben Hur Industrial was selected to supply professional millwrights to remove and replace eight, 14″ diameter hydraulic rams and bearings on aluminum casting machines. Of note, Ben Hur is the first union contractor to work for Spartan on these machines since 1961. We are looking forward to a long rewarding relationship with...

read more

University of Notre Dame Campus Crossroads – South Building

University of Notre Dame Campus Crossroads – South Building

South Bend, IN The South End Zone expansion is a 7.5 story structure that will serve as a multi-use student building, the main entrance into the football stadium, and as the supporting structure for a 5,200 square foot scoreboard.  Ben Hur provided the  erection of approximately 1,400 tons of structural steel and the erection of the structural precast demising wall that seperates the new building from the football stadium....

read more