Project Gallery

1/21
DJI_0022_Moment.jpg

St. Louis Zoo South Arrival

Project consisted of a new pedestrian bridge over Wells Dr and associated work, as well as renovation of the South Parking lot and the Saint Louis Zoo entrance, including earthwork, utilites, asphalt and concrete paving, retaining walls, water features, and lighting.

ben%252520hur%252520png_edited_edited_ed
  • Facebook
  • LinkedIn

©2020 Ben Hur Construction Co. All Rights Reserved